CPG Aeronautics….

Cornelius Gould's rocketry blog

Recent Posts

  • Next five Missions to come in the DEMO flight test series
  • DEMO-2 mission
  • The road to my Level 2 Certification attempt: The DEMO-1 mission
  • PLS-5016 & 5017: Ares’ Maiden voyages
  • PLS-5014 & 5015: Nesaru returns to the sky

>>>> Next Launch

  • No dates present

Search

CPG Aeronautics Links

  • About This Site…
  • X2-Artemis Launch Vehicle family
  • The History

Interesting Links

  • My Rocketry Club
  • Our Twitter Feed!
  • The Rocketry Forum
  • The Rocketry Planet
  • Ye Olde Rocketry Forum

Twitter Weekly Updates for 2012-03-25

Mar25
by admin on March 25, 2012 at 2:45 AM
Posted In: Twitter_log
  • Propellant loaded in anticipation of a Sunday liftoff for Artemis / Nala1, the first fully functional Artemis rocket! #

Powered by Twitter Tools

└ Tags: Twitter
 Comment 

Nala1 GO for 3/25 launch

Mar25
by cgould on March 25, 2012 at 2:13 AM
Posted In: XR2 (Artemis) Medium power booster Project

Artemis / Nala1 is go for a Sunday launch from O’Reilly field tomorrow (3/25/2012).

Launch time has been changed to 1PM due to low cloud deck forecasts early in the day.  Forecasts place the cloud deck at 800-1200 feet in the morning.  Nala1 is expected to reach near 1800 feet on this launch, so we’ve pushed back the maiden launch to 1PM at the earliest.

Nala

Artemis rocket NALA is named in memory of my cat, Nala, who passed away after nearly 17 years as my little buddy.

More details tomorrow from the launch site!

((( )))

 Comment 

Nala1 prepared for launch

Mar25
by cgould on March 25, 2012 at 12:06 AM
Posted In: Featured Picture

image

Nala1 prepped for launch…

 Comment 

March 24th launch scrubbed, rescheduled for March 25th

Mar23
by cgould on March 23, 2012 at 10:57 PM
Posted In: XR2 (Artemis) Medium power booster Project

Saturdays maiden launch of Artemis/Nala1 has been scrubbed due to unfavorable weather conditions.  MTMA will reschedule all launches for March 25th pending favorable conditions int he recovery field (no deep pockets of mud due to rain).

((( )))

 Comment 

Next Artemis rocket undergoes pre-flight tests in preparation for its maiden voyage

Mar21
by cgould on March 21, 2012 at 1:50 PM
Posted In: XR2 (Artemis) Medium power booster Project

Cuyahoga Falls, OH

The next Artemis booster, “Nala1” has been undergoing rigorous testing in preparation for its maiden voyage, currently scheduled for Saturday, March 24, 2012.  Nala1 will become the first fully operational rocket in the fleet, featuring payload capability of up to 1.5 pounds, fully functional flight computer, and the most powerful motor yet.

Nala1 shortly after completion last month.

 

The pre-flight tests include ground testing charges to separate the rocket at apogee (event 1), and deployment of the parachute at the pre-determined altitude (event 2).

The plan for the maiden voyage is to carry an on-board camera to an altitude of about 1800 and to verify the aerodynamic characteristics of the booster / payload combination.

The launch will be my first “rail launched” rocket, and the plan is to launch from one of the MTMA club rail launch pads.  By early this summer, missions will take off from launch pad #2, which is specifically designed for rockets from this class to the Nesaru launch vehicle.

Most of the tests have been completed, some design changes to the baffle systems were made, and those changes are due to be tested Wednesday (the 21st) Thursday the 22nd.

If all goes well, Nala1 will be cleared for launch this Saturday from the O’Reilly field.

“Nala1” is named in honor of my longtime pet cat,  Nala who passed away about three weeks ago.    This is the first fully operational Artemis class booster mission after nearly three years of testing with this design.

 

 

Nala1 booster being prepped for pressure tests & ground testing for flight event 1.

Video of the maiden launch and flight data will be posted within a couple days of launch, stay tuned to my website here for more details!

The weather outlook for this weekend’s launch shows a possibility of showers or thunderstorms on Saturday, which may force a delay until Sunday for launch.  In the meantime, the countdown has started for a Saturday launch pending the outcome of pre-flight tests & the weather outlook.

 

((( )))

 

 

 

 

 

 

 

 

 

 

 

 Comment 
  • Page 14 of 43
  • « First
  • «
  • 12
  • 13
  • 14
  • 15
  • 16
  • »
  • Last »
June 2025
M T W T F S S
 1
2345678
9101112131415
16171819202122
23242526272829
30  
« Sep    

Categories

  • Carina Shuttle Project
  • CG's Rocket Thoughts…
  • Current (Active) Projects
  • Dual Deployment Project
  • Featured Picture
  • General News
  • Launch and Recovery projects
  • Level1 Certification
  • Podcast
  • Random Stuff
  • The Road to Level 2 Certification
  • Twitter_log
  • Uncategorized
  • Video
  • XR1 (Aquila) Boster Project
  • XR10 – (Zephyr) Project Zephyr
  • XR2 (Artemis) Medium power booster Project
  • XR3 (Pegasus) High Performance Booster
  • XR4 (Perseus) Medium Power Booster project
  • XR5 (Aurora) Medium Power Booster
  • XR6 (Perseus V) high power booster.
  • XR9-C (Comanche) High Power Launch Vehicle

©2010-2020 CPG Aeronautics.... | Powered by WordPress with Easel | Subscribe: RSS | Back to Top ↑