CPG Aeronautics….

Cornelius Gould's rocketry blog

Recent Posts

  • Next five Missions to come in the DEMO flight test series
  • DEMO-2 mission
  • The road to my Level 2 Certification attempt: The DEMO-1 mission
  • PLS-5016 & 5017: Ares’ Maiden voyages
  • PLS-5014 & 5015: Nesaru returns to the sky

>>>> Next Launch

  • No dates present

Search

CPG Aeronautics Links

  • About This Site…
  • X2-Artemis Launch Vehicle family
  • The History

Interesting Links

  • My Rocketry Club
  • Our Twitter Feed!
  • The Rocketry Forum
  • The Rocketry Planet
  • Ye Olde Rocketry Forum

Twitter Weekly Updates for 2012-07-08

Jul08
by admin on July 8, 2012 at 2:45 AM
Posted In: Twitter_log
  • Launch Pad #2 First glimpse… http://t.co/EzBBHzh7 #

Powered by Twitter Tools

 Comment 

Nala1 mission updates…

Jun25
by cgould on June 25, 2012 at 9:08 AM
Posted In: XR2 (Artemis) Medium power booster Project

(Sunday, June 24, 2011 – Cuyahoga Falls, OH)

The mission updates for Artemis / Nala1 missions ALS044, ALS045, and ALS046 are long overdue, so here they are!

On Saturday, June 9, 2012, Nala1 flew two test flights.  The first of which, ALS044 had a good launch.  Wind gusts “kicked up” as the launch was in progress, which caused the rocket to experience a bit of a “wiggle” as it left the launch rail.  Nala1 recovered nicely, reaching an altitude of 960 feet.

The lower altitude was from the shaky launch, which put Nala1 on a trajectory that was less than ideal for maximum height.  Nala1 reached a peak speed of 230 MPH.

The drogue parachute deployed on the mark, but the secondary deployment charge overpressurized the booster section causing a separation of the booster from the rest of the rocket.

The booster fell from roughly 600 feet, and experienced some damage at impact. The rest of the rocket landed safely as the main deployment systems worked without incident.

After a repair to the booster lasting about two hours, Nala1 was ready for its next test flight for the day, mission ALS045.  ALS045 was a pretty routine launch, successful drogue deployment, but the main parachute was “stuck” in the parachute bay.   Nala1 landed under drogue parachute only.  There was no damage.

Mission ALS045 stats:

Maximum altitude: 980 Feet

Maximum speed: 230 MPH

On June 10, Nala1 was ready for its last test flight of the weekend.  During the flight of mission ALS046, the launch & drogue parachute deployment events were right on the mark.   During the main parachute deployment event, there was an over-pressurization of the main parachute baffle, which caused a cascade failure resulting in the separation of the upper section of the rocket from the lower one.

Again, no damage as the booster landed under drogue parachute deployment, and the upper section was on the main parachute.

Mission ALS046 stats:

Maximum altitude: 996 Feet

Maximum speed: 240 MPH

After reviewing the data from the last three launches, I’ve made design changes to the upper baffle system to allow for greater variations in the “power” of the deployment charges.  This system was ground tested on Saturday (June 23rd) with a much larger than normal ejection charge, and the system passed with flying colors.

Nala1’s next mission is tentatively scheduled for July 14th, 2012.  Two flights are scheduled, both are designed to test the solutions to the problems experienced off-and-on during her past six missions.

More info as we are closer to the date!

((( )))

 Comment 

Twitter Weekly Updates for 2012-06-10

Jun10
by admin on June 10, 2012 at 2:45 AM
Posted In: Twitter_log
  • Weather looks good for this weekend's launch. Nala1 electrical systems checkout looks good! #

Powered by Twitter Tools

└ Tags: Twitter
 Comment 

Twitter Weekly Updates for 2012-06-03

Jun03
by admin on June 3, 2012 at 2:45 AM
Posted In: Twitter_log
  • X6 Nesaru apogee ground test perfomed today. Booster passed with flying colors! #

Powered by Twitter Tools

└ Tags: Twitter
 Comment 

Twitter Weekly Updates for 2012-05-27

May27
by admin on May 27, 2012 at 2:45 AM
Posted In: Twitter_log
  • X6 Nesaru /Adventure drogue parachute ejection system completed. Drogue parachute baffle system completion underway… #
  • Work was completed on the Nesaru X6's Fin and motor assembly today. Work has begun on the drogue 'chute ejection system…. #

Powered by Twitter Tools

└ Tags: Twitter
 Comment 
  • Page 11 of 43
  • « First
  • «
  • 9
  • 10
  • 11
  • 12
  • 13
  • »
  • Last »
June 2025
M T W T F S S
 1
2345678
9101112131415
16171819202122
23242526272829
30  
« Sep    

Categories

  • Carina Shuttle Project
  • CG's Rocket Thoughts…
  • Current (Active) Projects
  • Dual Deployment Project
  • Featured Picture
  • General News
  • Launch and Recovery projects
  • Level1 Certification
  • Podcast
  • Random Stuff
  • The Road to Level 2 Certification
  • Twitter_log
  • Uncategorized
  • Video
  • XR1 (Aquila) Boster Project
  • XR10 – (Zephyr) Project Zephyr
  • XR2 (Artemis) Medium power booster Project
  • XR3 (Pegasus) High Performance Booster
  • XR4 (Perseus) Medium Power Booster project
  • XR5 (Aurora) Medium Power Booster
  • XR6 (Perseus V) high power booster.
  • XR9-C (Comanche) High Power Launch Vehicle

©2010-2020 CPG Aeronautics.... | Powered by WordPress with Easel | Subscribe: RSS | Back to Top ↑